Reply within 24 hours
Home / Factory

Production Strength & Quality System

Two plants, one production plan — see the lines, the equipment, the capacity and the certificates behind every package we ship.

Our Plants

Two Factories, One Building Package

FACTORY No.1

TAIHUA · Color Steel & Purlin Factory

Roll forming of color steel roofing and wall sheets, C/Z purlin cold forming, sandwich panel compounding and hardware assembly. Finished goods warehouse and container loading yard on site.

Roofing sheetsC/Z purlinsSandwich panelsHardware
FACTORY No.2

JIANGXIN · Steel Structure Factory

Cutting, welding and shot blasting of H-beam columns and rafters, complete portal frame fabrication and prefabricated steel building supply, with its own gantry crane bays.

H-beamPortal framesPrefab buildings
Equipment

Key Production Lines

The equipment list below is the honest version of “are you a real factory” — replace the numbers with your actual line counts before publishing.

Production linePlantQuantity
Color steel roof sheet roll-forming linesTAIHUA6 lines
Wall panel & glazed-tile forming linesTAIHUA3 lines
C / Z purlin cold-forming linesTAIHUA4 lines
Sandwich panel continuous compounding lineTAIHUA2 lines
Hardware assembly & packing lineTAIHUA2 lines
H-beam CNC cutting & assemblyJIANGXIN3 lines
H-beam submerged-arc weldingJIANGXIN4 sets
Shot blasting & primer line (Sa2.5)JIANGXIN1 line
Overhead gantry cranes 10–50 tJIANGXIN8 sets
0+Years of manufacturing
0m²Total plant area
0tMonthly steel throughput
0daysStandard lead time
Quality Control

Four Checkpoints Before Shipment

01

Raw Material

Coil mill certificates, zinc and coating thickness verification on intake.

02

In-Process

Profile dimension, punching accuracy and weld inspection during production.

03

Pre-shipment

Full dimension and quantity check with photo and video records.

04

Third Party

SGS / BV / TÜV inspection arranged on request before loading.

Certification Wall

Certificates & Compliance

One screen that answers the trust question. Replace the placeholders below with real certificate scans — and delete anything you do not hold.

ISO 9001Quality management system
CEEuropean conformity
SGSThird-party inspection
Mill certificatesSteel mill test certificates
Welding certificatesWelder & procedure quals
Test reportsCoating & panel testing
ISO 14001Environmental management
Custom clearance docsExport documentation set
Delivery & Export

Capacity that ships on schedule

A plan you can build your programme around.

Production slots are confirmed at order confirmation, and a container loading plan is issued before packing so your site programme and customs clearance run without surprises.

  • 15–25 day lead time for standard packages
  • Loading plan with piece counts and container mix
  • FOB / CIF / DDP terms, export documentation handled
  • Installation guidance and remote video support
WhatsApp Email us Get a Quote
Get a Quote WhatsApp